PESCADERO COAST, San Mateo County — November 21, 2026. A dated official transportation or public health alert affects residents and visitors. The information below distinguishes active advisories from planned work and should be rechecked before departure.
Two workdays next week
The Caltrans District 4 lane-closure system lists planned one-way traffic control on State Route 1 between Long Gulch and Pomponio Creek in San Mateo County on Monday, November 23, and Tuesday, November 24, 2026. The work is described as a washout and slide repair. This does not mean the entire Pescadero coast road is closed or that all nearby park entrances are inaccessible.
Hours and expected delay
The approved listing gives 8:01 a.m.–4:01 p.m. on both days with an estimated five-minute delay. One traffic lane is expected to serve alternating directions under traffic control. These are planned construction hours and approximate delay estimates, not a live measurement of the traffic queue.
Why a short lane restriction matters locally
Coastal Route 1 provides essential travel for Pescadero-area residents, agricultural workers, service providers and visitors. Local access choices can be limited when a work zone affects the main coast road. Drivers should allow extra travel time and avoid attempting to pass flaggers, workers or equipment on the road shoulder.
Keep this separate from storm and flood alerts
Slide repair is a specific construction operation. Additional storm runoff or erosion can produce new restrictions with different limits or hours. This notice does not state that a road is safe in every weather condition or guarantee no other Highway 1 closures on a long trip.
Before departing
Check Caltrans QuickMap or the California Highway Information Network for current travel status. The District 4 listing may be rescheduled because of rain or other operational conditions.
Official information
Primary government source: read the agency’s current statement and updates.
California58 independently summarizes original public records. The accompanying editorial photograph is illustrative, not an image of the exact worksite or a real-time water test.
Support Pescadero News
Choose how to support Pescadero News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Pescadero News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Pescadero News
- PESCADERO CREEK PARK CLOSED: County Tells Hikers to Stay Out Until Storm Damage Is Cleared →
- New Tunitas Creek Beach Park Near Pescadero Closes at 5 p.m. in November: What Visitors Need to Know →
- Thanksgiving in Pescadero: Plan a visit to Pescadero State Beach →
- North Pescadero State Beach Parking Remains Closed After November 2026 Tidal Event →
- Pigeon Point Lighthouse Crews Replace Corroded Support Beams as Restoration Enters Its Hardest Phase →

COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.